Answered By: Wayde Oshiro
Last Updated: Jan 08, 2025     Views: 16

The Leeward CC Library consists of two floors. However, as of September 2024, the upper level is closed for renovation, and all services and study areas are consolidated into a smaller footprint of the lower (main) level. Most of the library's books are in storage, and study spaces are limited. A quiet study space is available in the Library's Kapunawai Room.

Upon completion of this project in 2026, the renovated upper level will reopen with new study areas, collection spaces, staff offices, and group study rooms, and the total library space will be triple its current size. Learn more about this project at our Library Renovation page